Gill Civil Engineering Limited provides a range of specialised solutions to the construction industry, including:
Specifications

Dowel bar cage assembly prefabricated, ready for installation at transverse contraction joint
Side dowel bar drilling machine in operation
PCC concrete deposited in front of paving machine ready for laying
Concrete delivery tipper truck reversing back to paver on infill lane
Widened saw cut and sealant at bay intersection on brush finished concrete
Slip form paver in operation, engineers checking tolerance with 6 metre aluminium straightedge